BOARD RECAP
The
Fayette County Board of Education met in regular session on Monday, October 20,
2003 in the boardroom of the Fayette County Board of Education. The following actions were taken:
1.
Approved agenda
2.
Invocation - Reverend Howard Dial, Pastor of Berachah Bible Church
3.
Pledge of Allegiance - Brandon Roseborough, 1st grade and
Tristan Trussell, 2nd grade, Hood Avenue Primary School
4.
Comptroller Jim Stephens reported that the monthly finances are in
order
5.
Recognition: outstanding students and employees
6.
Certificates of Recognition from the Georgia Emergency Management
Agency were presented to the board
7.
Personnel items were approved as presented
8.
Comments from the public: Mr. Clarence Leathers commended the efforts
of
Dr. John DeCotis, Mr. Fred Phillips, and school
staff for the quick and timely manner of implementing the Transportation Task
Force.
9.
Items requiring action by the board:
a.
Energy Management Program Proposal was presented with changes based on
questions raised by board. The Proposal
was tabled until next month
b.
Approved Business representatives to serve on school council:
1) Ms. Carol Stallings,
Stallings Frame & Plaque Shop, Flat Rock Middle School
2) Ms. Roberta Osteen, Buck's
Pizza, Rising Starr Middle School
3) Mr. Bill Webb, Heritage
Bank, Whitewater High School
10.
Superintendent's Reports
a.
Lights On Afterschool Celebration Day held on October 9, 2003. Mrs. Julia Simpson, director of afterschool
program gave an overview of activities for the day.
b.
Update on Construction Program:
Whitewater
High School:
The ceiling suspension grid is being installed in
the classroom areas. The classroom walls
are being painted. The exterior brick is
being installed at the auditorium. The
heat pumps are being installed in the mechanical corridors for the
classrooms. The PE area second floor
concrete slab has been poured. The east
student parking lot has been paved. The
parking lot light standards have been installed. The fencing around the ball fields has been
installed.
East
Fayette Elementary School Kitchen:
The natural gas and electrical hook-ups are being
made to the kitchen equipment. All above
ceiling HVAC and electrical work is being completed for a ceiling cover
up. The scheduled completion is
approximately the week of November 3, 2003.
Fayetteville Intermediate School:
The Fire Marshall, Building Inspector, etc. are
scheduled for Thursday, October 16, 2003 or Friday, October 17, 2003 for final
inspection for Monday, October 20, 2003 occupancy.
McIntosh
High School:
The PE facility building pad has been graded to the
lower level floor slab. The fire
protection water line has been run from the area outside the Media to west of
the concession building. The new storm
sewer line has been installed from the detention pond to the building pad area.
Sandy Creek
High School:
The new staff parking lot has been graded with some
new concrete curb & gutter poured. Curb & gutter has been installed for
the new student parking entrance. The
storm sewer line has been installed from the detention pond to just past the southeast
corner of the existing building. The
existing drama and chorus area has been demolished. Ductwork is being installed in the new drama
location. Plumbing is being installed
for the new toilet areas.
12. There were no other matters to come before
the board
13. Adjourned
to executive session for discussion of real estate and pending litigation
14. Return
from executive session
15. No
action was taken relating to executive session
16. Adjourn