Board Recap
The Fayette County Board of Education met in regular session
on
1. Approved agenda
2. Invocation – Reverend Bob Hudak, Rector, Episcopal Church of the Nativity
3. Pledge of Allegiance
4. Monthly finances were reported to be in order
5. Presentation by Senator Mitch Seabaugh was postponed
6. Appearance:
Ms.
7. Personnel items were approved as presented
8. There were no comments from the public
9. Approved consent agenda
10. Items requiring action by the Board:
a. Approved contract for membership in Regional Educational Service Agency for the 2004-2005 fiscal year
b. Approved job description for Coordinator of Audits and Reporting
c. Approved Citigroup Global Markets for bond underwriter
d. Approved Student Code of Conduct for 2004 – 2005 school year
e. Approved resolution approving State Application
11. Superintendent’s Reports
a. Policies – will sit on the table for 30 days
1) Local School Councils (new policy)
2) Eligibility to attend Fayette County Schools (JBC)
b. Update on Construction Program
The floor tile is being installed in the Special Education classrooms
east of the gym. The gymnasium wood flooring installation is being completed.
The gymnasium bleacher installation has begun.
Exterior concrete walks have been poured. The staff parking lot in front of the school
has been paved. The kitchen equipment is
being connected to gas, water and electrical services. The locker installation has begun. Approximately 80% of the electrical services
for the ceiling mounted digital projectors have been installed. We have a temporary occupancy permit for just
the administrative area and the principal and some of his office staff has
moved in. Furnishings for the school are
being moved in and set up in the classrooms.
The cafeteria expansion into the chorus room is receiving block filler on the masonry walls. Block filler is being applied in the chorus and band modifications. Suspended ceiling grid is being installed in the band and chorus spaces. Masonry work in the classroom and teacher’s workroom on the second level is approximately 90% complete. Masonry walls are being constructed in the locker rooms on the upper level of the new P.E. facility. Base sheet on the roofing has been applied in the new P.E. facility.
Approximately 80% of the exterior brick walls have been constructed.
The auditorium ceiling has been framed and the contractor has begun installing the gypsum board on the ceiling. Electrical conduit and ductwork is being installed above the ceiling. Interior brick work is progressing. The metal panel installation on the high section is complete with the exception of the cap-flashing.
c. Other matters to come before the Board:
Approved November 2 for the bond to be placed on ballot
12. Adjourned to executive session for discussion of pending litigation/personnel
13. Returned from executive session
14. Action taken: renewal of superintendent’s contract was approved
15. Adjourned