Construction Update:
April 14, 2008: |
|
|
|
Inman
Road Elementary School |
|
|
|
The standing-seam metal roof is 99% completed in all sectors. The modified
bitumen roof (flat areas) is completed. The mechanical ductwork is
being installed to the Energy Recovery Units. The fire protection piping
(sprinkler lines) are being installed. The block filler has been applied to
the concrete masonry walls in Sector “D”. Permanent electrical power has
been installed to the building. Metal framing for the gypsum board ceiling
in the Media Center is being installed. The exterior insulation and finish
system is being applied to the gable ends of the roof and the arched areas
above the Administration area windows. The gas line has been installed to
the roof-top HVAC units. The concrete walkways have been poured at the
front and bus drive.
|
|
|
|
|
|
|
Rivers Elementary School
The Contractor has paid
the water meter fee, and is procuring all permits in order to start grading
the site. |
|
|
Minutes
from Construction
Advisory Committee Meetings |
|
|